Channel Tunnel Link
Client | Channel Tunnel Rail Link (CTRL) |
Date | 2004 |
Volume | 90,000 tonnes of Granite Aggregates |
Unloading of box wagons into 9m high hopper
Very strict time schedule adherence required, along with non-contamination of single sized material for stringent project compliance.
Operated and maintained conveyor discharge system which transfered materials to selected off loading stockpile bays, loading shovels supplied along with fully trained & certified operators, working 20hr 6day shifts to provide continuous feed to the segment plant.